Market making and execution

Temporary impact

Also called transient impact, instantaneous impact

The part of market impact that comes from using up liquidity at the moment of trading and fades once you stop.

How it works

Temporary impact is the price concession you pay for demanding liquidity now. It hits only the shares you are trading at that moment and does not carry into later prices. In Almgren and Chriss (2000) the execution price is the unaffected price, plus the permanent impact built up so far, plus h(v), where v is the trading rate. Their linear version is h(v) = epsilon x sign(v) + eta x v: epsilon is a fixed cost of about half the spread plus fees, and eta is the concession per unit of trading rate.

Because h depends on rate, not on total size, temporary cost falls when you stretch the schedule. Selling X shares at a constant rate X / T costs eta x X^2 / T in the continuous model, so doubling the time halves it. Waiting exposes the position to price variance, and the Almgren-Chriss schedule trades that variance against this cost.

Almgren, Thum, Hauptmann and Li (2005) measured it on Citigroup US equity orders. They define realised cost J from the average fill price against the pre-trade mid and model J = I / 2 + eta x sigma x (X / (V x T))^(3/5), with I the permanent impact, V daily volume and T the duration in days of volume. The I / 2 term is the permanent impact your own earlier fills put into the prices of later ones; the rest is temporary. They estimated eta = 0.142 and rejected a square-root form for this term in favour of the 3/5 power.

The common confusion is with the square-root law. That law describes the total price move by the end of a metaorder as a function of size, roughly independent of speed. Temporary impact is the rate-dependent part on top of the permanent shift, and it is the part your schedule can change.

Worked example

Almgren and co-authors' own case: buy 10% of a day's volume in IBM, daily volatility 1.57%. The temporary part is K = 0.142 x 1.57% x (0.1 / T)^0.6. Over 0.1 of a day the rate is 1, so K = 0.142 x 1.57% = 22 bp. Over 0.2 of a day K = 22 x 0.5^0.6 = 15 bp, and over half a day 8 bp. Permanent impact is 20 bp in all three cases and adds I / 2 = 10 bp, so realised cost is 32, 25 and 18 bp. Five times as long cuts the temporary part by 5^0.6 = 2.6 times, less than the five times a linear model gives.

In an interview

"In Almgren-Chriss with linear temporary impact, how does the cost of selling X shares change if you take twice as long, and what stops you taking forever?"

Temporary cost per share is eta x v with v = X / T, so the total is eta x X^2 / T: double T and that cost halves. The fixed part, epsilon x X, does not change. What stops you is risk. The variance of the proceeds grows with T (for a straight-line schedule it is sigma^2 x X^2 x T / 3, with sigma in price units), so a risk-averse trader minimises expected cost plus lambda times variance, which front-loads the sale. A strong candidate adds that linear permanent impact plays no part in the choice of schedule. The likely push is on the data: Almgren and co-authors (2005) found temporary cost grows with rate to the 3/5 power, so doubling T cuts it by 2^0.6 = 1.52 times, not 2.

Put it to work in a timed game.

Practise with Make the market: cards

Sources

  1. doi.org/10.21314/JOR.2001.041
  2. cis.upenn.edu/~mkearns/finread/costestim.pdf
  3. arxiv.org/abs/1204.2717
  4. arxiv.org/abs/1105.1694

Last checked November 2026.

← All 281 glossary terms

Was this definition clear?