Probability and risk
Expected shortfall
Also called ES, conditional VaR, CVaR, tail VaR, expected tail loss
The average loss in the worst tail of outcomes beyond a confidence level: for 97.5% ES, the mean loss over the worst 2.5% of cases.
How it works
Where VaR gives the threshold, expected shortfall says how bad things are past it, so it sees tail risk that VaR ignores. Properly defined, ES is a coherent risk measure, which includes being subadditive, so it never punishes diversification. Under FRTB, the Basel Committee's internal models approach uses ES at 97.5%, with liquidity horizons from 10 to 120 days and calibration to a period of significant stress. The 97.5% level was chosen because for normal losses it gives nearly the same number as a 99% VaR; with fat tails ES comes out larger.
Worked example
For normally distributed losses with standard deviation s, 99% VaR = 2.326 s and 97.5% ES = 2.338 s. On the £10m position with daily SD £150k, the one-day 97.5% ES is about £351k against a 99% VaR of £349k.
Related terms
Put it to work in a timed game.
Practise with Confidence IntervalsSources
- arxiv.org/abs/cond-mat/0104295
- bis.org/bcbs/publ/d457.htm
- bpi.com/why-is-the-frtb-expected-shortfall-calculation-designed-as-it-i…
Last checked November 2026.